Schneider Electric Xantrex XW Instalační příručka Strana 39

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 62
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 38
Installing the Battery Temperature Sensor
975-0540-01-01 Revision B 2–21
This guide is for use by qualified personnel only.
4. Pass the other end of the BTS cable through the knockout and strain relief
bushing on the charge controller, and then insert the BTS plug into the BTS
RJ-11 port. See Figure 2-15.
5. Replace the charge controller’s wiring compartment cover.
Figure 2-14 Attaching the BTS to a battery terminal
WARNING
HAZARD OF ELECTRIC SHOCK
The BTS cable must not pass through the same conduit used for PV wiring and
battery cables.
Failure to follow these instructions can result in death or serious injury.
Figure 2-15 Installing the BTS
+
+
+
+
Insert the BTS plug into
the charge controller’s
BTS port.
Attach the BTS to a
battery terminal or to
the side of a battery.
Zobrazit stránku 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 61 62

Komentáře k této Příručce

Žádné komentáře