Schneider Electric Modbus Plus Network Bridge Multiplexer none Instalační příručka Strana 139

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 261
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 138
Documenting the Network Layout
890 USE 100 00
125
4.6 Reviewing Your Topology Plan
Review your topology planning worksheet after you estimate the cable
lengths. Revise it if necessary to account for the minimum and
maximum cable length requirements. For example, if you have
estimated a cable length of less than 10 ft (3 m) between a pair of
nodes, you must revise your plan to meet this minimum length
requirement.
If you have estimated a distance of more than 1500 ft (450 m) between
two nodes, or if you are using more than 32 nodes on one cable section,
you must revise your plan to include at least one RR85 Repeater device
in the cable path.
When you have completed your topology planning, you can proceed to
the detailed worksheets in the rest of this chapter.
Zobrazit stránku 138
1 2 ... 134 135 136 137 138 139 140 141 142 143 144 ... 260 261

Komentáře k této Příručce

Žádné komentáře