Schneider Electric Modbus Plus Network Bridge Multiplexer none Instalační příručka Strana 231

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 261
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 230
Installing Custom Cable Systems
890 USE 100 00
219
D .5 Installing Connectors on Dual-Cable Runs
At each inline device site, an Inline Connector (AS-MBKT-085) must be
installed on both Cable A and Cable B. At the two device sites at the
extreme ends of the network, a Terminating Connector (AS-MBKT-185)
must be installed on both cables.
An individual connector is always wired to segments on the same cable
only, never to both cables. Cable A and Cable B should remain
independent through their entire runs.
For example, a connector may connect to two segments on Cable A.
A separate connector may connect to two segments on Cable B. The
same connector should never connect cables A and B together.
Make sure to properly label each connector (A or B) so that it can be
connected to the proper port (A or B) on the node device when it is
installed at the site.
Zobrazit stránku 230
1 2 ... 226 227 228 229 230 231 232 233 234 235 236 ... 260 261

Komentáře k této Příručce

Žádné komentáře